摘要
杨家河一级水电站安装3台单机容量为12.5MW的立式轴流转桨式水轮机组。根据洮河流域的特点,对水轮机结构进行了优化。机组自2007年投入运行至今,运行情况良好,各项指标均达到设计要求。
In order to install 3 single capacity of 12 .5 MW of vertical axial flow turbine units in Yangjiahe hydro-power station, it designs and optimizes turbine structure based on the characteristics of the basin .Since these 3 turbines put into operation in 2007 , they have been operating in good condition , all the indexes meet the design requirements .
出处
《机械设计与制造工程》
2013年第12期77-81,共5页
Machine Design and Manufacturing Engineering
关键词
杨家河水电站
水轮机选型
水轮机结构特点
Yangjiahe Hydropower Station
Turbine Selection
Turbine Structure Feature