期刊文献+

水电站渗漏集水井控制系统改造

Transformation of the Leakage Catchpit Control System in Hydraulic Power Station
下载PDF
导出
摘要 介绍了浙江浙能华光潭水力发电有限公司一级电站渗漏集水井控制系统的改造方案及实施情况。为了满足一级电站关门运行,利用现代工业计算机技术、通信技术、人机交换技术等,采用高可靠性的工业PLC控制器及高可靠、高稳定的液位测量元件,对系统功能进行了改进和优化。改造后,系统运行可靠性明显提高。 The paper introduces transformation scheme and implementation of leakage catchpit control system in first stage power plant of Zheneng Huaguangtan Hydropower Co. , Ltd. For the operation purpose of first stage power plant, the system function is improved and optimized using modern industrial computer technolo-gy, communication technology and human-machine interaction technology and adopting high-reliability indus-trial PLC controller, high-reliability and high-stability liquid level measurement element. After the transforma-tion, the operation reliability of the system is obviously improved.
作者 杨依娜 赵阳
出处 《浙江电力》 2014年第2期52-54,共3页 Zhejiang Electric Power
关键词 水电站 渗漏集水井 控制系统 改造 hydraulic power station leakage catchpit control system transformation
  • 相关文献

参考文献1

二级参考文献1

  • 1柴瑞娟,陈海霞.西门子PLC编程技术及工程应用[M].北京:机械工业出版社,2007.

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部