期刊文献+

近距离多煤层开采采空区积水防隔水煤岩柱留设研究 被引量:5

Coal and Rock Waterproof Pillar Design for Watered Gob in Mining Close Multi-coalseam
下载PDF
导出
摘要 防隔水煤岩柱的合理留设是采空区积水下安全开采的关键。新强煤矿属于近距离煤层群开采,随着开采深度加大,浅部采区开采形成的采空区积水已成为深部延伸开采的主要威胁水体。通过对矿井实际开采情况研究分析,在对具有连通关系的浅部采区进行封闭隔离,隔断其与其他未开采的采区的水力联系的基础上,对上覆煤层和侧方同煤层采空区积水区合理留设防隔水煤岩柱,确定其深部不同煤层的开采上限,实现了近距离多煤层采空区积水下的安全开采。 Rational coal and rock waterproof pillar design is the key to safely mining coal under watered gob .Close multi-coalseams were mined in Xinqiang Colliery.With mining depth increasing , watered gob formed in shallow mining has been main dangerous source for deep mining.By researching actual mining , shallow mining area with connection relationship was closed and isolated , rational water-proof coal and rock pillar was designed and mining upper limits of different coal -seams were obtained , which realized safe mining under watered gob.
出处 《煤矿开采》 北大核心 2014年第1期77-79,30,共4页 Coal Mining Technology
基金 国家"十二五"科技支撑计划项目资助(2012BAB13B02) 中国煤炭科工集团青年创新基金项目(2012MS004) 天地科技开采设计事业部基金项目(KJ-2013-TDKC-11)
关键词 近距离多煤层 采空区积水 防隔水煤岩柱 close multi-coalseam watered gob coal and rock waterproof pillar
  • 相关文献

参考文献7

二级参考文献13

共引文献537

同被引文献41

引证文献5

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部