期刊文献+

松软厚煤层仰斜综放开采端面稳定性控制研究 被引量:4

Study on Stability Control of Upward Fully Mechanized Top Coal Caving Face Ends in Soft and Thick Coal Seam
下载PDF
导出
摘要 针对松软厚煤层仰斜开采端面顶煤易漏冒的问题,采用理论分析得出影响其端面稳定性的因素有端面距s、支架工作性能以及仰斜推进角度β等;运用数值模拟得出各影响因素与端面顶板下沉量的关系;结合现场实测提出:加强管理、及时支护控制端面距,伪斜开采、合理提高支架工作阻力及适当降低采高、端面顶煤注浆或者打木锚杆加固等控制端面顶煤漏冒技术措施。 Aiming at the top coal leakage problem in upward fully mechanized top coal caving face ends of soft and thick coal seam, the condition was theoretically analyzed, the influence factors of face ends stability were tip - to - face distance s, working performance of hydraulic support, and upward advancing angle β, etc. The relationship between each influencing factors and roof subsidence of face ends was obtained through numerical simulation. Combing with in - situ measurement, top coal leakage controlling measures were proposed as follows, strengthening management, timely supporting and controlling the tip- to -face distance, oblique mining, reasonably increasing the hydraulic powered supports and lowering the mining height, and top coal grouting or reinforcement with wooden bolt.
出处 《煤炭工程》 北大核心 2014年第3期65-67,71,共4页 Coal Engineering
基金 国家重点基础研究发展计划(973计划)资助项目(2013CB227903) 国家自然科学基金项目(51004109) 煤炭资源与安全开采国家重点实验室开放课题(SKLCRSM11KFB05) 中央高校基本科研业务费专项资金资助(2010QZ02)
关键词 松软厚煤层 仰斜综放开采 端面稳定性 控制技术 soft and thick coal seam upward fully mechanized top coal caving face ends stability controllingtechnology
  • 相关文献

参考文献9

二级参考文献38

共引文献162

同被引文献40

引证文献4

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部