摘要
本文介绍了煤矿长斜巷正头掘进与斜巷中段联巷掘进同时施工的新型运输方式。
This paper introduces the coal mine long inclined lane head advancing and inclined lane middle lane tunneling simultaneous construction, which is a new mode of transportation.
出处
《价值工程》
2014年第9期15-16,共2页
Value Engineering
关键词
双系统提升
信号流程设计
双绞车布置
double hoisting system
signal process design
dual winch arrangement