摘要 盾构机法施工是我国地下隧洞工程施工中非常普遍的一种工艺方法。本文介绍了盾构机穿越南水北调工程地下垃圾填埋区内高压燃气管道的施工技术。通过地层加固和盾构机参数控制等措施,确保了盾构机安全顺利穿越垃圾填埋区及高压燃气管道,可供其他类似工程参考借鉴。 Shield machine construction is a process method, which is very popular in underground tunnel project construction in China. The constructiori technique of shield machine to pass through high pressure gas pipeline in underground garbage btirial area in South-to-North water diversion project is introduced in the paper, The shield machine can smoothly pass through the tinderground garbage burial area and high pressure gas pipeline by formation strengthening, control of shield machine parameter control and other measures, thereby providing reference for tither similar proiects,
作者 李永春
出处 《水利建设与管理》 2014年第2期25-28,共4页 Water Conservancy Construction and Management
关键词 盾构掘进 复杂地层 高危管道 施工技术 shield tunneling complex formation risk pipeline construction technology
  • 相关文献

参考文献2

共引文献34

同被引文献9

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部