北京市深井人工回灌现状调查与前景分析 被引量:44

Current situation investigation and prospect analysis of artificial recharge of ground water in Beijing city
下载PDF
导出
摘要 北京市地下水人工回灌研究始于 196 5年。 1981年开始生产性深井人工回灌。由于种种原因 ,至 1999年底实际回灌单位由 6 4个缩减至 13个。其间累计回灌量为 10 734.37× 10 4t。据调查 ,停灌原因主要有 :回灌单位停产、转产、回灌井被占 ,回灌井阻塞 ,泵改调频 ,单位搬迁和改换制冷设备等。本文通过对北京市三十几年来地下水人工回灌工作的总结 ,分析了人工回灌在近年来发展停滞的原因 。 The study of artificial recharge of ground water in Beijing City started in 1965,and the productive well recharge began in 1981.Due to various reasons,by the end of 1999,the number of artificial recharge units decreased to 13 from 64 at the beginning.The total recharge adds up to 107,343,700 over the period.Investigation result indicates that the main reasons for the stagnation are:Some recharge units stopped production,or switched to other production;Some recharge wells were blocked or taken over for other purposes;Change of location or reconstruction of the refrigeration facilities of the recharge units.This article concluded the artificial recharge of ground water of Beijing City over the past more than thirty years,and analyzed the reason why the development of artifiial recharge has been stagnated in recent years.The water saving potential of artificial recharge during the sustainable development and construction of the city and the prospect of development in the future are expounded.
作者 孙颖 苗礼文
出处 《水文地质工程地质》 CAS CSCD 2001年第1期21-23,48,共4页 Hydrogeology & Engineering Geology
关键词 城市节水 回灌井 空调冷却水 回灌方式 地下水 人工回灌 现状 city water saving recharge well cooling water for air conditioning blocking of recharge well recharge manner
  • 相关文献

参考文献6

  • 1《城市地下水工程与管理手册》编写委员会.城市地下水工程与管理手册[M].北京:中国建筑工业出版社,1993..
  • 2苗礼文.北京市人工回灌工作总结报告[M].,1999..
  • 3苗礼文,北京市人工回灌工作总结报告,1999年
  • 4《城市地下水工程与管理手册》编写委员会,城市地下水工程与管理手册,1993年
  • 5尚守忠,水资源及其开发利用,1993年
  • 6《供水水文地质手册》编写组,供水水文地质手册.3,1983年

同被引文献394

引证文献44

二级引证文献274

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部