锦屏水电站大奔流料场边坡锚索灌浆质量控制 被引量:2

Quality control of slope anchor grouting of Dabenliugou quarry of Jinping I Hydropower Station
下载PDF
导出
摘要 在锦屏一级水电站大奔流料场边坡锚索灌浆施工中,监理工程师采取"主动控制为主,被动控制为辅"的动态控制方法,对锚索灌浆质量进行控制。重视事前控制、预先防范、过程跟踪、强化检查、及时反馈。通过加强锚索灌浆施工工序、水泥净浆、质量控制点和质量检验等环节的控制,确保了锦屏一级水电站大奔流料场边坡锚索灌浆质量,为同类工程锚索灌浆施工质量控制提供了经验。 In the construction of the slope anchor grouting of Dabenliugou quarry of Jinping I Hydropower Station, the dynamic controlling method of relying mainly on active control while a subsidiary passive control is adopted in the supervision to control the quality of anchor grouting. The procedures such as pre-control, precautionary, process tracing, strengthening the inspection and timely feedback are focused. The quality of the slope anchor grouting of Dabenliugou quarry of Jinping I Hydropower Station was ensured through controlling related links such as construction procedures, cement pasting, quality point controlling and quality checking.
出处 《人民长江》 北大核心 2014年第4期52-55,共4页 Yangtze River
关键词 大奔流料场 锚索灌浆 质量控制 锦屏一级水电站 Dabenliugou quarry anchor grouting quality control Jinping I Hydropower Station
  • 相关文献

参考文献2

二级参考文献2

共引文献7

同被引文献5

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部