3Delhomme F, Debicki G. Numerical modelling of anchor bolts under pullout and relaxation tests [ J]. Construction and Building Materials, 2010, 24(7) : 1232 -1238.
4Bibel G, Ezell R. Bolted flange assembly: preliminary elastic interaction data and improved bolt - up procedures [ J ]. Bulletin - Welding Re- search Council, 1996, 408 : 1 - 27.
5Abasolo M, Aguirrebeitia J, Avil6s R, et al. A tetraparametric metamodel for the analysis and design of bolting sequences for wind generator flanges [ J ]. Pressure Vessel Technology, 2011, 113 (4) :041202 ( 1 - 15 ).
6Abasolo M, Agnirrebeitia J, Avil6s R, et al. Methodology for the opti- mization of bolting sequences for wind generator flanges [ J ]. Pressure Vessel Technology, 2014, 136(6) :061202( 1 - 13).
7Abid M, Hussain S. Relaxation behaviour of gasketed joints during assembly using finite dement analysis [J]. Sadhana, 2010, 35(1) : 31 -43.