摘要 通过对文登抽水蓄能电站上水库大坝施工全、强风化料相关物理力学试验成果的分析和论证,认为可以将水库区等部位开挖出来的全、强风化料填筑大坝使用,从而达到挖填平衡和减少弃渣的目的。 Through the analysis and demonstration of the data from the relevant physical and mechanical tests made on the com- pletely and strongly weathered-rock materials for the construction of the dam for the upper-reservoir of Wendeng Pumped Storage Hydropower Station, it is considered that the completely and strongly weathered-rock materials excavated from the area of the up- per-reservoir can be adopted as the filling materials for the construction of the dam, thus get the target of balancing excavation and filling and reducing the excavated wastes.
出处 《水利水电技术》 CSCD 北大核心 2014年第2期73-76,共4页 Water Resources and Hydropower Engineering
关键词 文登抽水蓄能电站 混凝土面板堆石坝 填筑料 Wendeng Pumped Storage Hydropower Station concrete face rock-fill dam filling materials
  • 相关文献

参考文献3

二级参考文献1

共引文献61

同被引文献9

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部