石砭峪水库大坝斜墙复合土工膜铺设方案 被引量:3

Placement scheme of composite geomembrane for inclined core-wall of dam for Shibianyu Reservoir
下载PDF
导出
摘要 主要介绍石砭峪水库堆石坝铺设复合土工膜施工方案的选择、设计计算公式的选取及土工膜与其他结构连接的处理。研究结果可为中小型水库的除险加固提供参考。 The selections of both the construction scheme and the design calculation formula for the placement of geomembrane for the inclined core-wall of the rockfill dam for Shibianyu Reservoir and the treatment of the joints between the geomembrane and the other structures are mainly described herein. The study results can provide some references for the risk-elimination and strengthening of those medium and small reservoirs.
出处 《水利水电技术》 CSCD 北大核心 2014年第2期83-86,共4页 Water Resources and Hydropower Engineering
关键词 石砭峪水库 堆石坝 大坝斜墙 复合土工膜 Shibianyu Reservoir rockfill dam dam incline core-wall composite geomembrane
  • 相关文献

参考文献5

  • 1周行是.对石砭峪水库采用定向爆破法筑坝的几点看法[J].水利水电技术,1983(1):15-18.
  • 2司志明.石砭峪水库定向爆破筑坝的设计与施工[J].水利水电技术,1980(1):13-20.
  • 3李军儒.石砭峪水库沥青混凝土防渗斜墙的设计与施工[J].水利水电技术,1981(4):41-44.
  • 4GB50290--98,土工材料合成应用技术规范[S].
  • 5SL/T235-1999.土工合成材料测试规程[S].[S].,..

共引文献19

同被引文献18

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部