摘要 结合工程实际,用物理模型试验对电厂单管进流、短过渡段泵房前池水力特性进行了模拟研究,提出了在进水前池内设置适宜的消能、整流横梁及斜向导墙工程措施,明显改善了前池内水流流态,入口水流均匀、平顺,为水泵的安全、经济运行创造了有利条件。 In accordance with engineering practice, the hydraulic characteristics of the forebay with single intake-pipe and short transition section for pumping house are simulated with the relevant physical model test, and then the engineering measures of ar- ranging transverse beam and inclined guide wall suitable for energy dissipation and flow straightening are put forward, thus the flow regime in the forebay is obviously improved, i.e. the water intake flow is uniform and smooth, and then a favorable condi- tion is made for the safe and economic operation of pump.
出处 《水利水电技术》 CSCD 北大核心 2014年第2期123-125,共3页 Water Resources and Hydropower Engineering
关键词 泵房 进水前池 横梁 导流墙 pumping house water intake forebay transverse beam guide wall
  • 相关文献

参考文献6

  • 1南京水利科学研究院,水利水电科学研究院.水工模型试验(第二版)[M].北京:水利电力出版社,1985.
  • 2GT/T50265--97,泵房设计规范[S].
  • 3DIGJ150-1999,火力发电厂循环水泵房进水流道及其布置设计技术规定(试行)[S].
  • 4DL/T286-2012,发电厂循环水系统取水流道模型试验规程[S].
  • 5American National Standard. ANSI/HI 9. 8-1998, Pump Intake Design [S]. American Ntional Standard Institute, Inc. 1998.
  • 6日本机械学会标准.JSME,S004-1984,水泵水池模型试验法[M].北京:水利电力出版社,1986年.

共引文献2

同被引文献56

引证文献8

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部