期刊文献+

人工湿地强化脱氮研究进展 被引量:13

Research progress in the enhancement of nitrogen removing by constructed wetlands
下载PDF
导出
摘要 脱氮效率不高一直是困扰人工湿地应用的问题之一,如何强化人工湿地脱氮已成为近年来的研究热点。人工湿地对于氮的去除作用主要有氮的挥发、水生植物的吸收、基质的吸附、沉淀以及微生物的硝化与反硝化作用,也发现了一些新的脱氮途径,如短程硝化反硝化、同步硝化反硝化等。从湿地结构改进、运行方式优化、建立湿地组合系统、基质优选、植物筛选、微生物调控等方面详细论述了人工湿地强化脱氮措施及净化效果,以期为人工湿地技术优化与工程应用提供参考。 Low nitrogen removing efficiency has been one of the problems that disturbs the application of constructed wetlands. How to enhance denitrification by constructed wetlands is one of research hot spots in recent years. Con- structed wetlands act on nitrogen removing mainly by way of nitrogen volatilization, absorption of aquatic plants, ad- sorption of substrate, precipitation, and microbial nitrification and denitrification. Moreover, some new routes of den- itrification have also been found, such as short-range nitrification and denitrification, synchronous nitrification and denitrification, etc. Measures to enhance constructed wetlands nitrogen removal and purification effect are expound- ed in detail ' including improvement of wetlands structure,optimization of operating conditions,establishment of combined system with other types of constructed wetlands,optimization of substrates and plants,microorganisms regulation, etc., so as to provide reference for the optimization and engineering application of constructed wetland technique.
出处 《工业水处理》 CAS CSCD 北大核心 2014年第3期6-10,共5页 Industrial Water Treatment
基金 国家自然科学基金项目(51178452) 湖北省杰出青年基金项目(2010CDA093) 国家科技支撑计划(2012BAJ21B03-04) 国家水体污染控制与治理科技重大专项(2012ZX07101007-005) 湖北省教育厅科学技术研究项目(Q20114401) 湖北理工学院引进人才项目(11yjz08R)
关键词 人工湿地 脱氮 强化措施 constructed wetland denitrification enhancement measures
  • 相关文献

参考文献59

  • 1Kadlec R H, Wallace S D. Treatment wetlands [ M ]. 2nd ed. New York: CRC Press, 2008: 8-11.
  • 2Zhang Ting, Xu Dong, He Feng, et al. Application of constructed wetland for water pollution control in China during 1990-2010 [J ]. Ecological Engineering, 2012,47 : 189-197.
  • 3USEPA. Constructed treatment wetlands [ M ]. United States Envi- ronmental Protection Agency, 2004: EPA 843-F-03-013.
  • 4Vymazal J, Brix H, Cooper P F, et al. Removal mechanisms and types of constructed wetlands[M]//Vymazal J,Bfix H,Coper P F,et al. Constructed wetlands for wastewater treatment in Europe. Leiden: Backhuys Publishers, 1998 : 182-190.
  • 5Seidel K. Abgau yon baSterium coli durch hohere wasserpflanzen [J]. Naturwiss, 1964,51 : 395.
  • 6Kadlec R H. Detention and mixing in free water wetlands [J ]. Ecol- ogical Engineering, 1994,3 : 345-380.
  • 7吴振斌,雷志洪.一种污水处理方法及装置:CN,00114693.9[P].2000-07-11.
  • 8Green M, Friedler E,Safrai I. Enhancing nitrification in vertical flow constructed wetland utilizing a passive air pump[J]. Water Research, 1998,32(12) : 3513-3520.
  • 9孙亚兵,冯景伟,田园春,李署,帖靖玺,张继彪,袁守军.自动增氧型潜流人工湿地处理农村生活污水的研究[J].环境科学学报,2006,26(3):404-408. 被引量:79
  • 10Ouellet-Plamondon C, Chazarenc F,Comeau Y,et al. Artificial aera- tion to increase pollutant removal efficiency of constructed wetlands in cold climate [ J ]. Ecological Engineering, 2006,27 ( 3 ) : 258-264.

二级参考文献350

共引文献793

同被引文献215

引证文献13

二级引证文献63

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部