兰州深安黄河大桥工程钢拱桥整体顶推施工技术

Integral Incremental Launching Construction Technology of Steel Arch Bridge in Lanzhou Shenan Yellow River Bridge Project
下载PDF
导出
摘要 该文结合兰州市深安黄河大桥工程钢拱桥顶推施工,介绍了步履式顶推的工艺特点及顶推临时结构措施,分析了钢拱桥多点步履式整体顶推施工的施工技术要点,对同类桥梁施工具有一定借鉴价值。 According to the incremental launching construction of steel arch bridge in Lanzhou Shenan Yellow River Bridge Project, the article introduces the technological characteristics of walking incremental launching and its temporary structural measures, and analyzes the gist of the multi-point walking integral incremental launching construction technology of steel arch bridge, which can be referred for the construction of the similar bridges.
出处 《城市道桥与防洪》 2014年第2期111-114,12,共4页 Urban Roads Bridges & Flood Control
关键词 钢拱桥 步履式 整体顶推 同步性 兰州市 steel arch bridge,walking type,integral incremental launching,synchronism
  • 相关文献

参考文献3

  • 1上海市政工程设计研究总院.兰州市深安黄河大桥工程主桥施工图设计文件[Z].2011.
  • 2JTG/TF50-2011,公路桥涵施工技术规范[S].
  • 3GB50017-2003T,钢结构设计规范[S].

共引文献626

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部