2HUANG W Q,YIN A H.An improved shifting bottleneck procedure for the job shop scheduling problem[J] .European Journal of Operational Research,2004,31(12):2093-2110.
3CHANG Y,MATSUO H,SULLIVAN R S.A bottleneckbased beam search for job scheduling in a flexible manufacturing System[J] .International Journal of Production Research,1989,27(11):1949-1961.