1[1]Echave J, Shah J J. Automatic set-up and fixture planning for 3-axis milling. In:Proceedings of ASME design Engineering Technical Conferences, DETC99-DAC8571, 1999
2[2]Brost R C, Goldberg K Y. A complete algorithm for designing planar fixtures using modular components. IEEE Transactions on Robotics and Automation, 1996, 12(1):31~46
3[3]Brost R C, Peters R R. Automatic design of 3-D fixtures and assembly pallets. In:Proceedings of the 1996 IEEE International Conference on Robotics and Automation, 1996
4[4]Wu Y, Rong Y, Ma W, et al. Automated modular fixture planning:geometric analysis. Robotics & Computer-Integrated Manufacturing, 1998, 14:1~15
5[5]Wu Y, Rong Y, Ma W, et al. Automated modular fixture planning:accuracy, clamping, and accessibility analysis. Robotics & Computer-Integrated Manufacturing, 1998,14:16~26
6[6]Zhuang Y, Goldberg K Y, Wong Y C. On the existence of modular fixtures. In:Proceedings of the 1996 IEEE International Conference on Robotics and Automation, 1994
7[7]Penev K, Requicha A A G. Fixture foolproofing for polygonal parts. In:Proceedings of the IEEE International symposia on Assembly and Task Planning, Pittsburgh, PA, 1995
8[8]Kumar A S, Fun J Y H, Kow T S. An automated design and assembly of interference-free modular fixture setup. Computer Aided Design, 2000, 32(2):583~586
9ASADA H, BY A B. Kinematic analysis of workpart fixturingfor flexible assembly with automatically reconfigurable fixtures[J]. IEEE Journal of Robotics and Automation, 1985,1(2):86-94.
10TRAPPEY A J C, LIU C R. An automatic workholding verifi-cation system[J]. Robotics Computer-Integrated Manufac-turing,1992,9(4/5):321-326.