沿海高速公路曹妃甸支线穿越了软土、软弱土、渍盐土,以及不良地质砂土液化区,项目全线均为填方路基。为了提高地基承载力、保证路基稳定,提出了科学的软基处治方案,并对方案进行设计,为项目建设、施工提供科学依据。
Coastal highway Caofeidian branch through the soft soil, poor subsoil, saline soil, and bad geological sand liquefaction area, across all projects is fill subgrade. In order to improve the foundation bearing capacity, guarantee the stability of roadbed, scientific soft ground treatment scheme was proposed, and design the scheme, provide the scientific basis for the project construction.