摘要
通过对施工过程中软土路基段落进行沉降监测、水平位移监测、孔隙水压力和土压力监测等方法,确定软基处置方案合理性和施工控制过程的有效性,以保证路基强度和整体稳定性。
Through the settlement monitoring, horizontal displacement monitoring, pore water pressure and earth pressure monitoring on soft soil subgrade construction paragraph, determine the rationality of soft foundation disposal scheme and the effec- tiveness of the construction control process, to ensure the roadbed strength and entirety stability.
出处
《内蒙古公路与运输》
2014年第1期22-24,共3页
Highways & Transportation in Inner Mongolia
关键词
软土
沉降
水平位移
压力
监测
soft soil
settlement
horizontal displacement
pressure
monitoring