冷却塔塔筒子午向钢筋布置 被引量:1

Meridian Reinforcement Arrangement of Cooling Tower Tube
原文传递
导出
摘要 参照现行火力发电厂水工设计规范(DL/T 5339—2006),根据冷却塔子午向钢筋的布置特点,提出了冷却塔子午向钢筋布置迭代的计算方法,并编制出塔筒子午向配筋程序SMS。基于某工程,进行了SMS方法与其他方法的对比计算分析,结果表明,SMS计算方法计算效率较高,可以很好地解决塔筒子午向配筋计算问题,对于搭接点较多的其他高耸建筑结构的钢筋布置计算也有很好的参考意义。 Based on the requirement of "Code for hydraulic design of fossil fuel power plants" ( DL/T 5339 - 2006 ), and the arrangement characteristic of meridian reinforcement in cooling tower, an iterative computation method for the meridian reinforcement in cooling tower was proposed and the computational program SMS was complied. Taking a project as example, the comparative analysis was carried out between SMS and other methods. The results show that SMS has higher computation efficiency, which can well solute the calculation problem of the meridian reinforcement in cooling tower. What' s more, it is significant to the reinforcement arrangement of tall building structure with many lap joints.
作者 陈斌 王小松
出处 《电力建设》 2014年第2期76-79,共4页 Electric Power Construction
基金 重庆市教育委员会基金项目(KJ080413) 重庆交通大学(桥梁)结构工程重点实验室开放基金资助项目(CQSLBF-Z10-1)
关键词 冷却塔 塔筒 子午向钢筋布置 钢筋根数 迭代计算 cooling tower tube meridian reinforcement arrangement reinforcement number iterative computation
  • 相关文献

参考文献10

二级参考文献31

共引文献361

同被引文献5

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部