摘要
介绍了泸定电站230 MW混流式水轮机的基本性能要求和结构特点,对水轮机的技术参数和主要部件结构特点进行了详细介绍。
This paper presents the basic performance and structural features of the Francis turbine with the capacity of 230 MW for the Luding Power Station, along with detailed introduction on technical parameters of the turbine and the structure features of its main components.
出处
《东方电气评论》
2014年第1期31-36,共6页
Dongfang Electric Review
关键词
泸定电站
混流式水轮机
设计
Luding power station
francis turbine
design