摘要 详细介绍了苏州星海街9号既有厂房改造结构设计的思路、方法及改造设计全过程。根据改造前可靠度鉴定结果,充分利用原厂房特点,发挥原结构盈余度,保留原厂房90%以上结构;采用预制方桩进行地基基础加固;采用现浇空心楼盖进行加层设计;对外加走廊、入口门厅、内庭院开洞等设计进行了详细分析和合理构造;另外对改造前后主体结构进行整体对比分析计算,提供了新增楼面与原结构连接的不同方法,且对加层改造后整体结构再次进行检测鉴定,确保结构安全。 Design idea, methods and the entire design process of the original factory reconstitution in No. 9 Xinghai Street of Suzhou were introduced. Based on the reliability qualification tests before reconstitution, more than 90% original structure of the factory was retained, making full use of the original factory's characteristics and structural surplus. Prefab square piles were used to strengthen foundations. Cast-in-situ concrete hollow floor structure was used to add floors. Detailed analysis and reasonable constitution were carried out for outside corridors, entrance hall and the hole in the inner courtyards. Analysis and calculation results of the overall structure before and after the reconstitution were compared. Different methods of connecting the new added floor and the old structure were provided. Additional qualification tests of the whole structure after reconstitution were carried out to ensure safety.
出处 《建筑结构》 CSCD 北大核心 2014年第3期56-62,共7页 Building Structure
关键词 既有厂房 结构鉴定 加层 改造 加固设计 对比分析 original factory structural qualification adding floor reconstitution strengthening design comparative analysis
  • 相关文献

参考文献6

  • 1GB50011-20叭建筑抗震设计规范[s].2008年版.北京:中国建筑工业出版社,2008.
  • 2GB50292-1999,民用建筑可靠性鉴定标准[S].北京:中国建筑工业出版社,1999.
  • 3GB50023-2009,建筑抗震鉴定标准[S].北京:中国建筑工业出版社,2009.
  • 4CECS175-2004现浇混凝土空心楼盖结构技术规程[S].北京:中国计划出版社,2005.
  • 5GB50367-2006,混凝土结构加固设计规范[S].北京:中国建筑工业出版社,2006.
  • 6JGJ117-98民用建筑修缮工程查勘与设计规程[s].北京:中国建筑工业出版社,1999.