期刊文献+

承包方全家户口迁出的。承包地能否收回?

下载PDF
导出
摘要 答:承包期内,承包方全家迁入小城镇落户的,应当按照承包方的意愿,保留其土地承包经营权或者允许其依法进行土地承包经营权流转;承包方全家迁入设区的市,转为非农业户口的,应当将承包地交回发包方,承包方不交回的,发包方可以收回承包地。
出处 《陕西农业科学》 2014年第3期55-55,共1页 Shaanxi Journal of Agricultural Sciences
  • 相关文献

参考文献11

  • 1APHA-AWWA-WPCE.1998.Standard methods for the examination of water and wastewater[M].20th ed.Washington DC,USA.
  • 2Bertrand-Krajewski J L,Chebbo G,Saget A,1998.Distribution of pollutant mass vs.volume in stormwater discharges and the first flush phenomenon[J].Water Research,32:2341-2356.
  • 3Characklis,G W,Wiesner M R,1997.Particles,metals,and water quality in runofffrom large urban watershed[J].Journal of Environmental Engineering,123(8):753-759.
  • 4Deletic A,1998.The first flush load of urban surface runoff[J].Water Research,32:2462-2470.
  • 5Ebina J,Tsutsui T,Shirai T,1983.Simultaneous determination of total nitrogen and phosphorus in water using peroxodisulfate oxidation[J].Water Research,17:1721-1726.
  • 6Gnecco I,Berretta C,LanZa L G et al.,2005.Storm water pollution in the urban environment of Genoa.Italy[J].Atmospheric Research,77:60-73.
  • 7Kim L H,Kayhanian M,Zoh K D et al.,2005.Modeling of highway stormwater runoff[J].Science of the Total Environment,293:163-175.
  • 8Lee J H,Bang K W,Ketchum L H et al.,2002.First flush analysis of urban stormrunoff[J].Science of the Total Environment,293:163-175.
  • 9Suarez J,Puertas J,2005.Determination of COD,BOD,and suspended solids loads during combined sewer overflow (CSO)events in some combined catchments in Spain[J].Ecological Engineering,24:201-219.
  • 10Taebi A,Droste R L,2004.First flush pollution load of urban stormwater runoff[J].Journal of Environmental Engineering,3:301-309.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部