年产千万吨300m长综放工作面开采技术 被引量:11

Mining Technology of 300 m Long Fully-Mechanized Top Coal Caving Mining Face with Annual Production of over 10 Millions Tons
下载PDF
导出
摘要 为实现矿井年产千万吨的目标,以平朔井工一矿浅埋深、两硬条件下的特厚煤层为例,介绍了采用国产成套装备为主的300 m长综放工作面安全高效开采技术,结合工作面矿压显现、支架适应性、顶煤冒放性等指标,评价了特厚煤层千万吨300 m长综放工作面安全高效开采效果。结果表明:采用300 m长工作面综放开采的采煤方法,确定割煤高度为3.8 m、放煤高度为8.7 m,通过合理配套工作面设备,工作面平均日产4万t左右,平均月产108万t,最高月产118万t,平均年产1 200万t以上,工作面采出率88.98%,实现了单工作面年产1 000万t以上的目标。 In order to realize a target of a mine with an annual production of over 10 million tons, taking a ultra thick seam in Pingshuo No.1 Underground Mine under the conditions of a shallow mining depth, hard coal and hard roof rock as a case, the paper introduced the safety and high efficient mining technology on a 300 m long fully-mechanized top coal caving mining face mainly with the domestic completed set equipment. In combination with the mine strata pressure behaviors of the coal mining face, powered support suitability, top coal caving and other indexes, the paper evaluated the safety and high efficient mining effect of the 300 m long fully-mechanized top coal caving mining face with an annual coal production of over 10 million tons in the ultra thick seam. The results showed that with a 300 m long coal mining face and the fully-mechanized top coal caving mining method, the cutting height of the coal mining face was set as 3. 8 m and the coal caving height was set as 8. 7 m. With the rational matched coal mining face equipment, an average production per day of the coal mining face was about 40 000 tons, the average month production of the coal mining face was 1. 08 million tons, the max month production was 1. 18 million tons, the average annual production was over 12 million tons and the coal mining recovery rate of the coal mining face was 88. 98%.The annual production over 10 million tons from a single coal mining face was realized.
出处 《煤炭科学技术》 CAS 北大核心 2014年第3期32-35,共4页 Coal Science and Technology
基金 国家自然科学青年基金资助项目(51304115) "十二五"国家科技支撑计划资助项目(2012BAK04B08)
关键词 特厚煤层 浅埋深 两硬煤层 千万吨工作面 300 m长综放工作面 ultra thick seam shallow mining depth hard coal and hard roof seam coal mining face with annual production of over 10 million tons 300 m long fully-mechanized top coal caving mining face
  • 相关文献

参考文献14

二级参考文献81

共引文献432

同被引文献236

引证文献11

二级引证文献96

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部