摘要
文章以合浦某工程为例,阐述了混凝土灌注桩基桩承载力的检测方法及承载力分析方法。分析了施工过程对基桩承载力的影响,强调泥皮是阻碍桩侧摩阻力发挥的重要因素。
Taking a project in Hepu as example,the paper discusses the methods for detecting and analyzing the bearing capacity of cast-in-place concrete pile,analyzes the influence of construction on the pile bearing capacity, and emphasizes that mud cake is an important factor against the effect of pile side friction.
出处
《红水河》
2014年第1期52-54,共3页
Hongshui River
关键词
混凝土灌注桩
承载力
cast-in-place concrete pile
bearing capacity