摘要
西津水电站自建库以来,由于河道的采砂、沿河工程建设、洪水等作用,库区河床地形及库容曲线均发生了变化,通过对库区固定断面地形的复测分析河床的演变并修正库容曲线。
Since the reservoir of Xijin hydropower station has been put into operation, the riverbed topography and the storage-capacity curve were changed due to river sand mining, the project construction along the river, and the effects of floods etc. The riverbed evolution was analyzed and the storage-capacity curve was corrected through resurveying the fixed section topography of reservoir area.
出处
《红水河》
2014年第1期65-69,共5页
Hongshui River
关键词
库容曲线
冲淤
西津水电站
storage-capacity curve
deposition and erosion
Xijin hydropower station