摘要
重症监护病房(ICU)是医院特有的重要组织机构,是衡量医院医疗急救水平的重要标准。ICU的建设包括团队建设,仪器设备等硬件设施建设及技术水平等软件建设。科学管理是提高ICU团队的工作水平和效率的关键。通过加强药品及仪器管理、病室管理、医护人员的培训及管理、探视制度管理等方面来提高ICU对危重患者的救治水平,更好地为各种危重患者服务。
Intensive care unit (ICU) is one of the important organizations and the important standard to measure the level of hospital medical first aid. The construction of ICU included team construction, equipment and other hardware facilities construction and technology such as software. The key to improve the ICU team work level and the efficiency is scientific management. By strengthening drug and instrument management, hospital management, medical staff training and management, visitation system management to improve the level of treatment in critically ill patients in the ICU, better services for all kinds of critically ill patients.
出处
《四川生理科学杂志》
2014年第1期24-25,共2页
Sichuan Journal of Physiological Sciences
关键词
ICU
建设
管理
ICU
Construction
Management