期刊文献+

大采高支架特殊工况下过冲刷带技术 被引量:4

Passing Scouring Zone Technology in Large Mining Height Support Special Conditions
原文传递
导出
摘要 大采高工作面在遇到特殊地质构造的情况下,在工作面岩石进行松动爆破的推进过程中,支架在被动受压、不合理工况下运行,导致整体结构件出现开焊、变形等问题,严重制约工作面的正常开采。如何采用合理解决方案实现工作面的不间断开采,是大采高工作面普遍面临的难题,云冈矿大采高工作面在开采过程中通过试验采取提前开掘小切巷及支架组装硐室,进行小范围的支架撤换,缩短的搬家时间,多回收了宝贵资源。 When the working face with large mining height is under special geological condition, during the advancing process of work- ing face rock loose blasting, support is operated in passive pressure, unreasonable conditions, and it results in unsoldering and deform- ation of support overall structure and other problems, which seriously restricts the normal mining at working face. How to adopt the rea- sonable solutions to achieve uninterrupted mining working face is a difficult problem for large mining height face. In the mining process of working face, through taking advance digging small cutting lane and support bracket assembly chamber, removing small scale in Yungang Mine, which can shorten the moving time, recover more valuable resource.
作者 王志刚
出处 《煤矿安全》 CAS 北大核心 2014年第3期86-87,91,共3页 Safety in Coal Mines
关键词 特殊地质构造 不间断开采 合理解决方案 大采高支架 冲刷带 special geological structure continuous mining reasonable solution large mining height support scouring zone
  • 相关文献

参考文献3

二级参考文献7

共引文献69

同被引文献36

引证文献4

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部