期刊文献+

基于相关进近模式的双跑道容量计算及仿真 被引量:4

Calculation and Simulation of Two-runway Capacity Based on Dependent Approach Model
下载PDF
导出
摘要 为了评估相关平行仪表进近模式下的双跑道容量,总结了相关进近对跑道构型及运行规则等方面的要求,描述了切合实际的相关进近时空图。通过对经典单跑道混合运行模式下容量计算模型的理论升级,建立了双跑道容量数学计算模型;并采用有别于传统的simmod仿真工具——anylogic进行建模仿真。将模型计算结果和仿真结果进行对比,两者数据显示:跑道容量值的差异率低于2%,与实际运行情况比较贴近,进而证实了理论分析方法和建模仿真的合理性。 In order to evaluate two-runway capacity, requirements in terms of runway configuration and opera- tion regulation were summarized, realistic time -space diagram of dependent approach was described. Relying on theory upgrade on the classic capacity calculation model of single runway of mixed operation mode, mathematical model of two-runway capacity was established. Unlike traditional simmod and using a new simulation tool-anylogic for modeling and simulation, the model calculation results and simulation results were compared, the two data shows : the differentia rate of runway capacity is less than 2%, and relatively close to the actual operation, thus the theoretical analysis method and modeling and simulation is confirmed reasonable.
作者 高伟 傅炜
出处 《科学技术与工程》 北大核心 2014年第4期108-112,共5页 Science Technology and Engineering
基金 国家自然科学基金委员会与中国民用航空局联合项目(61039001)资助
关键词 跑道容量 相关平行仪表进近 时空图 ANYLOGIC 仿真 runway capacity dependent approach space-time diagram anylogic simulation
  • 相关文献

参考文献10

  • 1Blumstein A. The landing capacity of a runway. Operations Re- search, 1959, 7(6): 752-763.
  • 2Harris R M. Models for runway capacity analysis. Washington DC: Mitre Corporation, 1969.
  • 3Kohler A, Potential airport capacity gains from the optimal assigmnent of aircraft types to runways. Massachusetts Institute of Technology, 2004.
  • 4Massimini V. Simultaneous and dependent parallel instrument ap- proaches. McLean, Virginia : Mitre Corporation, 2006.
  • 5陈欣,陆迅,朱金福.枢纽机场空侧容量利用和流量分配优化模型[J].南京航空航天大学学报,2007,39(5):680-684. 被引量:8
  • 6郭海琦,朱金福.近距平行跑道容量及延误水平计算模型[J].交通运输工程学报,2008,8(4):68-72. 被引量:27
  • 7尹嘉男,胡明华,张洪海,等.多跑道协同运行模式优化方法.ht-tp://www.cnki.net/kcms/detail/11.1929.V.20130808.1440.001.html,2013.
  • 8理查德·德·纽弗威尔,阿米第·R·欧都尼.机场系统:规划、设计和管理.北京:中国民航出版社,2006.
  • 9中国民用航空总局.平行跑道同时仪表运行管理规定.北京:中国民用航空总局,2004.
  • 10中国民用航空总局.中国民用航空空中交通管理规则.北京:中国民用航空总局,1999.

二级参考文献16

  • 1Gilbo E P.Optimizing airport capacity utilization in air traffic flow management subject to constraints at arrival and departure fixes[J].IEEE Transactions on Control Systems Technology,1997,5 (5):490-503.
  • 2Gilbo E P.Optimization of airport capacity and arrival-departure flow through the runway-fix system[R].Interim Technology Report.Cambridge,Massachusetts:Volpe Center,1994.
  • 3Gilbo E P.Airport capacity:representation,estimation,optimization[J].IEEE Trans Contr Syst Technol,1993,1(3):144-154.
  • 4Gilbo E P,Parkin L P.Fix load analysis[R].Interim Technology Report.Cambridge,Massachusetts:Volpe Center,1994.
  • 5Airport Association Council International-North America.Airport/airway system capacity needs[M].Washington DC,USA:Airport Association Council International(ACI)-North America,1992.
  • 6HARRIS R M. Models for runway capacity analysis[R]. Washington DC: Mitre Corporation, 1969.
  • 7NEWWELL G F. Airport capacity and delays[J]. Transportation Science, 1979, 13(3): 201-241.
  • 8HORONJEFF R M, MCKELVEY F X. Planning and Design of Airports[M]. San Trancisco: McGraw-Hill Professional, 1993.
  • 9MUDD L E. Airport capacity and delay[R]. Washington DC: Department of Transportation, Federal Aviation Administration, 1983.
  • 10LEE D A, NELSON C, SHAPIRO G. The aviation system analysis capability airport capacity and delay models[R]. Washington DC: NASA, 1998.

共引文献33

同被引文献24

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部