摘要
结合马岭河特大桥的特殊工程实例,通过施工模拟计算从理论上论证了塔梁同步施工的可行性,阐述了在采用塔梁同步施工情况下施工控制的重点内容和控制技术,可为以后其他采用塔梁同步施工的斜拉桥建设提供参考。
Combined with the special project of Maling river super-large bridge, this paper theoretically demonstrates the feasibility of tower beam synchronous construction through construction simulation cal- culation, and expounds the main content of construction control and control technology in the situation of adopting beam synchronization in the tower construction, so as to provide reference for the construction of other cable-stayed bridges with tower beam synchronization.
出处
《交通标准化》
2014年第5期60-64,共5页
Communications Standardization
关键词
斜拉桥
塔梁同步施工
对比研究
可行性
施工控制
cable bridge
tower beam synchronization construction
contrast research
feasibility
con-struction control