大连地铁2号线钢弹簧浮置板整体道床施工技术 被引量:3

Construction Technology of Steel Spring Floating Slab Track on Dalian Metro Line 2
下载PDF
导出
摘要 钢弹簧浮置板整体道床轨道为目前国内降噪减振效果较好的结构设计,但与普通整体道床轨道相比其工艺复杂、工序繁复、工程造价高、施工周期长、质量控制难度大,施工过程中质量通病亦频发,成为地铁工程铺轨施工中的难点及关键部位。介绍了对大连地铁2号线钢弹簧浮置板整体道床轨道的施工技术及质量控制措施。 Currently,the steel spring floating slab track is widely used in urban rail transit all over China,which is considered as a better structural design in reducing engineering noise vibration.But compared with the general whole track bed,this new track also shows complex technology,complicated process,higher cost,longer construction period and difficult quality control,etc.Because of the frequent faults in construction,the steel spring floating slab has become one of the difficult points and key parts in track-laying engineering.Based on Dalian metro Line 2 construction where the steel spring floating slab is adopted,the construction technology and quality control measures are introduced in this paper.
作者 于晓东
出处 《城市轨道交通研究》 北大核心 2014年第3期99-101,115,共4页 Urban Mass Transit
关键词 大连地铁 钢弹簧浮置板 整体道床 施工技术 Dalian metro steel spring floating slab whole track bed construction technology
  • 相关文献

参考文献6

二级参考文献13

共引文献98

同被引文献13

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部