摘要
介绍了华润电力登封有限公司火电发电二期(2×600MW级)电厂引水隧洞施工过程中遭遇破碎带危岩、流砂层坍塌、洞内涌水量大等问题的解决方法与施工技术,工程实践表明取得了良好的效果,对类似工程的设计、施工有一定的参考价值。
The water tunnel of coal burning power plant, which is the Second Phase of Dengfeng Electricity Co. , Let, Huarun Group, is underneath the rock mass with complicated geological and hydrological conditions. The tunnel construction tech- niques under the adverse conditions such as, fractured rock mass zone, running sand and groundwater rush are discussed in the- paper.
出处
《土工基础》
2014年第1期38-41,共4页
Soil Engineering and Foundation
关键词
火力发电厂
引水隧洞
破碎带危岩
流砂层
地下涌水
coal burning power plants water tunnels fractured rock mass quicksand layers water rush