摘要
针对中国铅合金冷却研究堆(CLEAR-I)的设计需要,提出了一种非能动事故余热排出系统的方案设计。该系统利用反应堆容器外的空气自然循环,把事故工况下的堆芯余热排出到最终热阱。通过CFD数值求解耦合经验公式的手段,对该非能动事故余热排出系统的运行进行模拟,验证了设计方案的可行性。
Based on the design requirement for the China Lead Alloy Cooled Research Reactor, a preliminary design of passive emergency decay heat removal system was presented. Air natural circulation around the reactor vessel was adopted by this system to remove the decay heat of the reactor core under accident conditions. Via the numerical method using CFD code coupled with empirical formula's solution, the emergency decay heat removal system was simulated..And the feasibility of the system was validated by the calculation result.
出处
《核科学与工程》
CSCD
北大核心
2014年第1期91-96,共6页
Nuclear Science and Engineering
基金
国家自然科学基金重大研究计划重点支持项目"加速器驱动次临界堆瞬态安全过程与影响机理研究"(91026004)
中国科学院战略性先导科技专项"ADS嬗变系统"项目(XDA03040000)
关键词
中国铅合金冷却研究堆
空气自然循环
事故余热排出系统
China Lead Alloy Cooled Research Reactor, air natural circulation, emergency decay heat removal system