期刊文献+

模具制造项目风险分析与处理

Risk Analysis and Management of Manufacturing Project on Mold & Die
下载PDF
导出
摘要 指出了对模具制造这一典型项目管理过程进行风险识别、分析与处理的重要性及必要性,依据模具制造项目的工作流程对其进行了风险识别,详细说明了模具制造项目可能产生的风险种类和原因,并提出了常用的处理方案,为模具项目组长提供了决策依据。 This article indicates the importance and necessity to analyze and manage the risks of the manufacturing project on mold and dies , makes a risk analysis for it according to its workflow , demonstrates deliberately types of probable risks , theories and methods to estimate and evaluate them , which will help project manager to make a right decision .
作者 陈娟 王宗忠
出处 《现代制造技术与装备》 2014年第1期56-58,共3页 Modern Manufacturing Technology and Equipment
关键词 模具制造 项目管理 风险识别 风险分析 风险处理 mould &amp . die manufacturing project management risk identification risk analysis risk management
  • 相关文献

参考文献4

二级参考文献21

  • 1李英杰,陈庆新,陈新度,陈新.多属性的虚拟企业并行协商项目规划算法[J].机械工程学报,2005,41(2):215-222. 被引量:17
  • 2卿兆波,王晓林,杨惠中.基于模糊相似比较的模具报价方法的研究[J].数学的实践与认识,2005,35(5):123-130. 被引量:9
  • 3沈卫华,陈晨,陈庆新,毛宁.基于本体的模具设计知识表达、检索与推理[J].机械科学与技术,2005,24(11):1301-1305. 被引量:4
  • 4陈圣磊,吴慧中,肖亮,朱耀琴.协同设计任务调度的多步Q学习算法[J].计算机辅助设计与图形学学报,2007,19(3):398-402. 被引量:11
  • 5Neumann K. Scheduling of Projects with Stochastic Evolution Structure [M] // Weglarz J,ed. Project Scheduling-recent Models, Algorithms and Applications. Boston: Kluwer Academic Publishers, 1999.
  • 6Neumann K,Steinhardt U. GERT Networks and the Time-oriented Evaluation of Projects[M]//Lecture Notes in Economics and Mathematical Systems,Berlin,Springer, 1979.
  • 7Choi Jaein, Realff M J, Lee J H. Dynamic Programming in a Heuristically Confined State Space: a Stochastic Resourceconstrained Project Scheduling Application[J]. Computers and Chemical Engineering, 2004,28: 1039-1058.
  • 8Herroelen W S, Leus R. Project Scheduling under Uncertainty: Survey and Research Potientials [J]. European Journal of Operation Research, 2005, 165 : 289-306.
  • 9Aytug H, Lawley M, Mckay K, et al. Executing Production Schedules in the Face of Uncertainties: a Review and Some Future Directions[J]. European Journal of Operation Research,2005,161:86-110.
  • 10Debels D, Vanhoucke M. Future Research Avenues for Resource Constrained Project Scheduling: Search Space Restriction or Neighborhood Search Extension[R]. Belgium: Ghent University,2006.

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部