改进的估计高速公路工作区通行能力的多元回归模型 被引量:2

An Improved Multiple Regression Model For Freeway Work Zone Capacity Estimation
下载PDF
导出
摘要 考虑关闭车道数与关闭车道位置的联合作用对高速公路工作区通行能力的影响,使通行能力的估计模型更加准确。首先计算影响因素与通行能力之间的相关关系,得到关闭车道数与关闭车道位置的联合作用对通行能力也有较大的影响。然后用多元回归分析建立工作区通行能力与因素间的函数表达式。最后,利用现场数据将此模型与另外两个模型进行比较。回归结果表明,拟合优度有所提升,残差从之前的2 962.72降低到10.26。 The objective of this article is to consider the combined effects of number of closed lanes (NUMCL)and location of closed lanes (LOCCL)on freeway work zone capacity.Firstly,a corre-lation matrix was calculated.It proves that the combined effects of NUMCL and LOCCL have great influ-ence on capacity.Secondly,a multiple regression analysis was developed for establishing a functional re-lationship between work zone capacity and influencing factors.Finally,the improved model was compared with other existing capacity models using field data.The results indicate that the goodness-of-fit increases and residual error is reduced from 2 962.72 to 10.26.
出处 《公路工程》 北大核心 2014年第1期19-22,共4页 Highway Engineering
基金 国家自然科学基金项目(61175055 51108391)
关键词 高速公路 工作区 通行能力 影响因素 联合作用 freeway work zone capacity influencing factors combined effects
  • 相关文献

参考文献11

  • 1彭兆锋,葛婷.高速公路改扩建作业区的合理布设[J].公路工程,2012,37(1):187-191. 被引量:10
  • 2Kim, T. , D.J. Lovell, and J. Paracha, A New Methodology to Estimate Capacity for a Freeway Work Zones [ C ], Trans- portation Research Board, Washington, D.C. , 2001.
  • 3Abrams, C. M. , and J. I. Wang, Planning and Scheduling Work Zone Traffic Control[ R]. Report FHWA-IP-81-6. Fed- eral Highway Administration, U.S. Department of Transporta- tion, 1981.
  • 4Highway Capacity Manual. Transportation Research Board, National Research Council, Washington, D.C. , 1965.
  • 5Highway Capacity Manual. Transportation Research Board, National Research Council, Washington, D.C. , 2000.
  • 6Krammes, R. A. , and G. O. Lopez, Updated Short-Term Freeway Work Zone Lane Closure Capacity Values[ R]. Re- port FHWA/TX - 92/1108 - 5.Federal Highway Administra- tion, U.S. Department of Transportation and Texas Depart- ment of Transportation, Austin, 1992.
  • 7Al-Kaisy. , A and F. L, Hall, Guidelines for Estimating Free- way Capacity at Long-Term Reconstruction Zones[ C ]. Trans- portation Research Board, Washington, D.C. , 2002.
  • 8Adeli, H. , and A. Karim, Radial Basis Function Neural Net- work for Work Zone Capacity and Queue Estimation[ J]. Jour- nal of Transportation Engineering, Vol. 129, No. 5, Septem- ber 2003.
  • 9Heaslip, K., Kondyli, A., Arguea, D., Elcfteriadou, L. and Sullivan, F. Estimation of Freeway Work Zone Capacity Using Simulation and Field Data[ C ]. Transportation Research Board, Washington, D.C., 2009, pp. 16-24.
  • 10李嘉,许国初.多车道道路改扩建工程中最优施工区长度的研究[J].公路工程,2008,33(5):56-60. 被引量:10

二级参考文献14

共引文献15

同被引文献14

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部