基于ALARP的桥梁风险矩阵决策方法研究 被引量:6

Study on the Method of Bridge Risk Matrix Decision Base on ALARP
下载PDF
导出
摘要 通过对各种风险改善措施的效益进行分析,确定最优的方案,是桥梁工程中的风险评价和风险决策中常常遇到的问题。研究表明:当用于改善安全的资金达到一定程度时,会出现资金投入对风险控制的边际效应。采用决策论的理论和方法,结合风险矩阵和ALARP准则,形成基于ALARP的桥梁风险矩阵决策方法。该方法不仅反映决策者的风险态度,也为基本的风险对策制定提供了依据。 The problem that determing the optimal scheme through the effectiveness analysis of a variety of risk improvement measures is often encountered.The study demonstrated that there will be a marginal effect on the risk control,When the risk improvement funds reach to a certain extent,By using decision theory and methods,the ALARP criteria was combined with the risk matrix,and the method of bridge risk matrix decision base on ALARP was established.The method not only can reflect the risk atti-tudes of decision makers,but also can provide basis for the formulation of basic risk measures.
出处 《公路工程》 北大核心 2014年第1期63-65,共3页 Highway Engineering
基金 湖南省交通运输厅科技项目(201162)
关键词 桥梁风险评估 风险决策 ALARP风险矩阵 bridge risk assessment risk decision ALARP risk matrix
  • 相关文献

参考文献2

  • 1岳超源.决策理论与方法[M].北京:科学出版社,2004..
  • 2谢海涛.桥梁施工风险评估实用方法研究及其在钻孔灌注桩施工中的应用[D].长沙:中南大学,2008.

共引文献40

同被引文献65

引证文献6

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部