南水北调中线工程实施阶段投资控制的风险因素及对策

Risk Factors and Suggestions for Investment Control on the Implementation of Middle Route of the South-to-North Water Diversion Project
下载PDF
导出
摘要 南水北调中线工程实施阶段投资控制是工程投资控制的重要环节,也是工程建设目标顺利实现的重要保证。通过分析工程实施阶段投资控制基本情况、风险因素,并探讨加强投资控制的对策建议,对加强投资控制管理,防范投资控制风险,有效控制工程投资具有重要意义。根据调研分析,投资控制的风险因素有八个方面,即项目建设管理、物价及政策、勘测设计、征地移民、招标投标、工程变更与索赔、建设工期延误和地方利益诉求。在此基础上,提出强化资金计划管理、严格规范合同管理、加强变更索赔处理、加强建设组织协调和完善投资控制考核制度等五个方面控制风险的对策建议。要做好实施阶段投资控制工作,防范投资风险,需各方共同努力,实事求是、统筹协调,整体推进、科学管控,以实现预期经济效益和社会效益。 The investment control during Middle Route of South-to-North Water Diversion Project was an important part of project investment control, and was also important to the smooth construction goals achieved. By analyzing the basic situation and risk factors of project investment control, and explore suggestions to strengthen the investment control had important significance for strengthening investment management, in- vestment control risk prevention and effective control of the project investment. According to survey, eigth risk factors influenced investment control:project management, prices and policy, survey and design, land acquisition and resettlement, bidding, engineering changes and claims, construction schedule delays and local interest demands. On this basis, we put forward five suggestions:strengthen financial plans management, standardize contract management, strengthen change and claims management, strengthen the organization and coordination of project construc+ tion, and improve investment management appraisal system. We should make the work of investment control during implementation stage effectively. All parties needed work together to prevent investment risk,and seek truth from facts coordination to achieve the expected economic and social benefits.
作者 张杰平
出处 《南水北调与水利科技》 CAS CSCD 北大核心 2014年第B01期1-4,共4页 South-to-North Water Transfers and Water Science & Technology
关键词 南水北调 中线工程 实施阶段 投资控制 风险因素 对策 效益 South-to-North Water Diversion Project Middle Route Project implementation phase+ investment control risk factors countermeasure benefit
  • 相关文献

参考文献12

二级参考文献30

  • 1李晓鹏,蒋礼明,汪友才.水利工程投资控制中应注意的问题[J].四川水力发电,2004,23(B06):46-47. 被引量:3
  • 2施华堂,黄元,王可.工程投资控制的方法与实施[J].人民长江,2004,35(8):56-58. 被引量:9
  • 3河北省水利水电勘测设计研究院.南水北调中线京石段应急供水工程占迁安置规划修订报告[R].2006.
  • 4任兆锋 王瑜.浅谈水利工程投资控制.科技信息,(26):111-111.
  • 5丛培经.实用工程项目管理手册[M].北京:中国建筑工业出版社.2007.
  • 6巢元凯,张方,滕绍华.实用建筑设计手册[M].北京:中国建筑工业出版社,2009.
  • 7全国监理工程师建设工程投资控制编委会.全国监理工程师建设工程投资控制[M].北京:北京科海电子出版社,2010.
  • 8河南省水利勘测设计研究有限公司.南水北调中线一期工程总干渠沙河南-黄河南郑州2段征迁安置实施规划报告[R].郑州:河南省水利勘测设计研究有限公司,2009.
  • 9朱健.浅谈水电工程移民综合监理的投资控制[C]∥第一届全国水利水电移民工程学术研讨会论文集.北京:[s.n.],2010.
  • 10Whipple W, Jr. Water Resources: A New Era for Coordination[M]. Reston, ASCE Press, 1998.45-49.

共引文献60

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部