浅议南水北调中线总干渠工程变更管理

Engineering Change Management of the South-to-North Water Diversion Canal
下载PDF
导出
摘要 南水北调中线总干渠工程建设任务重、跨行业交叉工程,资金供应及变更管理等合同问题非常关键。工程变更是合同签订后,因设计条件、施工现场条件、设计方案等发生变化,为合同目的而对设计文件或施工状态所做出的改变与修改。建管单位根据国家相关法律、法规以及国务院南水北调工程建设委员会办公室有关规定,结合工程实际,加强南水北调中线干线工程建设管理,规范工程变更管理行为,使工程投资得到有效的控制。 The South-to-North Water Diversion canal construction task, cross industry cross project, the supply of funds and change management contract is very important. Engineering change is after the signing of the contract, because of the design conditions, construction site conditions, design change, for the purposes of the contract and made the design documents and construction state changes and modifications. Construction u- nit according to the relevant state laws, regulations and the relevant provisions of the State Council of the South-to-North Water Diversion Pro- ject Construction Committee Office, combined with engineering practice, strengthen the South-to-North Water Diversion Project construction management, normative engineering change management behavior, to effectively control the project investment.
出处 《南水北调与水利科技》 CAS CSCD 北大核心 2014年第B01期69-70,88,共3页 South-to-North Water Transfers and Water Science & Technology
关键词 南水北调 总干渠 工程建设 投资控制 变更管理 South-to-North Water Diversion Project main canal project construction investment control change management
  • 相关文献

参考文献8

  • 1GB-2000-0208,水利水电工程施工合同和招标文件示范文本中相关合同条款[s].
  • 2国务院南水北调工程建设委员会办公室.关于加强南水北调工程设计变更管理工作的通知[z].2006.
  • 3国务院南水北调工程建设委员会办公室.南水北调工程合同监督管理规定(试行)[z].2011.
  • 4南水北调中线干线工程建设管理局.关于加快南水北调中线干线工程变更与索赔处理有关事项的通知[z].2011.
  • 5国务院南水北调工程建设委员会办公室.关于切实加强南水北调工程重大设计变更管理工作的通知[z].2012.
  • 6国务院南水北调工程建设委员会办公室.关于加强南水北调工程投资控制管理的通知[z].2013.
  • 7南水北调中线干线工程建设管理局.关于南水北调中线干线工程建设管理局变更索赔管理行为有关情况的报告[Z].2013.
  • 8长江勘测规划设计研究有限责任公司.南水北调中线一期工程总干渠某铁路桥涵及牵出线工程变更施工费用审核报告[z].2013.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部