摘要
“代建制”是一种新的投资项目管理模式,在该模式下的工程延期索赔没有明确的管理规定,往往按承包人的索赔被忽视。文章参照南水北调代建制管理模式,分析了该模式下工程延期索赔的特点,并依据工程延误产生的原因区分代建单位责任和项目法人责任,提出项目法人责任原因产生的工期延误是代建单位提出工程延期索赔的依据,详细介绍了在代建制管理模式下工期索赔和费用索赔的计算方法及其适用范围,并通过工程案例,介绍了审核代建制管理模式下工期索赔和费用索赔应注意的问题。
"Construction agent system"is a new management mode of investment projects, engineering delayed claim no clear regulations in this mode, often by the Contractor's claims are ignored. In the light of the South-to-North Water Diversion Project of agent construction management mode,analyzes the characteristics of Engineering delayed claim of this mode,and based on the causes of project delay the distinguish responsibili- ty construction unit and the project legal person responsibility, put delay the project legal person responsibility reason is based on the engineering delayed claim agent construction units,introduced in detail the calculation method in the the agent construction management mode time claims and cost claims and its applicable range, and through the engineering case, the attention should be paid to the audit of agent construction manage- ment mode time claims and cost claimsproblems.
出处
《南水北调与水利科技》
CAS
CSCD
北大核心
2014年第B01期83-85,共3页
South-to-North Water Transfers and Water Science & Technology
关键词
代建制
延期索赔
审核
责任划分
工期索赔
费用索赔
construction agent system
delayed claim
audit
division of responsibilities
claim for extension of time
cost claim