摘要
目前南水北调中线京石段工程已完工,所有变更、索赔项目已处理完毕。文章举例介绍了个别典型变更和索赔案例,分析了案例处理过程,并提出相关建议。为进一步处理南水北调中线后期工程建设的变更和索赔工作提供参考意见,有助于南水北调工程变更和索赔处理工作进一步规范化、标准化、系统化。
At present, the Beijing Shijiazhuang section of the South-to-North Water Diversion Middle Route Project has been completed, all the changes, the project has finished processing the claim. This paper introduces the typical individual case analysis of changes and claims, the case handling process,and proposes relevant suggestions. Provide a reference for the further processing of the South-to-North Water Diversion Pro- ject construction alteration and claim the late work, contribute to the South-to-North Water Diversion Project changes and claims processing work further standardization, standardization, systematization.
出处
《南水北调与水利科技》
CAS
CSCD
北大核心
2014年第B01期89-90,共2页
South-to-North Water Transfers and Water Science & Technology
关键词
南水北调
变更
索赔
典型案例
South-to-North Water Diversion Project
change
claim
typical case