3Baruah P,Chinnam RB.HMMs for diagnostics and prognostics in machining processes[J]. International Journal of Production Research, 2005,43(6): 1275-1293.
4Chinnam RB,Baruah P.A neuro-fuzzy approach for estimating mean residual life in condition-based maintenance systems[J]. International Journal of Materials and Produce Technology, 2004,20: 166-179.
5吴翊,李永乐,胡庆军.应用数理统计[M].北京:国防科技大学出版社,2008:112-120.
6Feldman K,Jazouli T,Peter A,et al.A Methodology for determining the return on investment associated with prognostics and health management[J].IEEE Transactions on Reliability, 2009,58(2); 305-316.
7Ramakrishnan A,Pecht MG.A life consumption monitoring methodology for electronic system[J]. Components and Packing Technologies IEEE Transactions on,2003,26(3):625 634.