摘要
从工艺塔堵塞,液泛,分离效果不佳等方面对PET装置高负荷运转时工艺塔出现的异常进行原因分析,并制定出相应处理措施。通过改造,减少异常的产生,减少对装置产品品质造成的影响。
The reasons for the process column abnormal appeared when PET plant high-load operation were ana- lysed form the blockage, flooding and poor separation measures were formulated, Through transformation, the plant product quality was reduced. effect of the process column. The corresponding treatment generation of the abnormal was reduced, the influence on
出处
《聚酯工业》
CAS
2014年第2期36-39,共4页
Polyester Industry
关键词
PET
工艺塔
异常处理
PET: process column: abnormal treatment