摘要
介绍了石家庄地铁中山广场站到解放广场站区间暗挖施工的具体情况,分析了工程施工存在的重大风险,并针对性的提出了应对措施,以期为工程顺利实施提供参考。
The paper introduces the major risks in the underground excavation at the segment between Zhongshan Square Station and Jiefang Square Station in Shijiazhuang, and points out respective measures accordingly, so as to provide some reference for the smooth construction.
出处
《山西建筑》
2014年第10期166-167,共2页
Shanxi Architecture
关键词
地铁
暗挖
风险
措施
subway, underground excavation, risk, measures