摘要
以某钢结构特大桥工程为例,对钢结构的施工质量控制措施进行了综述,简要介绍了施工前准备阶段及工厂制作的质控要点,着重从缆索吊装系统安拆与钢结构安装焊接两方面阐述了钢结构现场施工要点,以供参考。
Taking some steel structure super-large bridge project as the example, the paper has the survey of the construction quality controlling measures for the steel structure, mainly introduces the preparing stage before construction and the quality control points for the workshop manufac turing, and illustrates the construction points for the steel structure site from the installation and demolishment of the cable erection system and the installation and welding of the steel structure, so as to provide some reference.
出处
《山西建筑》
2014年第10期233-234,共2页
Shanxi Architecture
关键词
钢结构
质量控制
安装
焊接
steel structure, quality control, installation, welding