The Role of Architectural Considerations in Seismic Performance of Buildings: A Case Study in Iran
The Role of Architectural Considerations in Seismic Performance of Buildings: A Case Study in Iran
参考文献11
-
1H. Arbabian, The role of architects in seismic design: What we can learn from traditional construction, in: International Conference on the Seismic Performance of Traditional Buildings in Istanbul, Turkey, 2007.
-
2J.L. Lagorio, Earthquakes: An Architect's Guide to Nonstructural Seismic Hazards, John Wiley & Sons, New York, 1990.
-
3F.M. Saradj, Seismic issues in the design the process: The role of architect in seismic safety issues in design process, International Journal of Engineering Science 19 (6) (2008) 9-20.
-
4Lorant Group, Seismic Design Principles, http://www.wbdg.orgldesign/seismic_design.php/ (accessed Mar. 15,2012).
-
5H. Degenkolb, Seismic Design: Structural Concepts, Summer Seismic Institute for Architectural Faculty, AlA Research Corp, Washington, 1977.
-
6ISNA (Iranian Students' News Agency), 2005, http://www.isna.ir/(accessed Dec. 21, 2012).
-
7IIEES (International Institute of Earthquake Engineering and Seismology), Bam earthquake report, Tehran, Iran, 2003.
-
8IIEES (International Institute of Earthquake Engineering and Seismology), Preliminary report of Dahouiyeh (Zarand-Kerman) Earthquake Identification Group: Behavior and Performance of Buildings, Tehran, Iran, 2003.
-
9J. Ambrose, D. Vergun, Design for Earthquakes, John Wiley & Sons, New York, 1999.
-
10IIEES (International Institute of Earthquake Engineering and Seismology), Darbe Astaneh Silakhor Earthquake, Earthquake identification report, Tehran, Iran, Mar. 31, 2006.
-
1房屋漏水应由谁赔偿?[J].东南置业,2013(7):93-93.
-
2魏小国.国际承包工程中业主的反索赔[J].山西建筑,2003,29(7):225-226.
-
3周雪林.监理单位在工程质量损害赔偿中承担的法律责任[J].科学与管理,2009,29(6):112-113.
-
4岑树华.监理在工程质量损害赔偿中的法律责任[J].中国交通建设监理,2005(5):30-32.
-
5王树恒.图方便从窗户扔垃圾 致人损害赔偿四万多[J].公民与法(审判版),2015,0(6):60-60.
-
6吴强,苏光柱.谈设计单位在建设工程质量损害赔偿中的责任[J].山西建筑,2009,35(10):211-212.
-
72016伊朗国际建材展(Iran ConFair 2016)[J].中国对外贸易,2016(4):59-59.
-
8贾金青.Seismic Performance of Steel Reinforced Ultra High-strength Concrete Columns[J].四川大学学报(工程科学版),2009,41(3):216-222. 被引量:1
-
9隋海波.建设工程质量缺陷的损害赔偿责任主体及责任范围[J].建筑经济,2001(6):37-39. 被引量:3
-
10林志群.火灾事故损害赔偿行政调解实践的几点思考[J].建筑知识:学术刊,2012(B12):102-103.