期刊文献+

Analysis on the Design of Japan FIT after Fukushima Disaster Using GIS and TIMES Integrated Model

Analysis on the Design of Japan FIT after Fukushima Disaster Using GIS and TIMES Integrated Model
下载PDF
导出
摘要 This study aims to illustrate the Japanese electricity supply system after the earthquake with consideration of Japanese uniqueness including its 10 separate grids with weak connections between them and the geographical gap between renewable potential and electricity consumptions using GIS data for a TIMES model. We take FIT (feed-in-tariff) as a policy measure to promote renewables. To consider policies to promote renewables, we need a modelling approach where the electricity system of the entire country is represented with extremely disaggregated information on existing stock and future potentials of renewables. By building up technology models based on detailed disaggregate information on existing stocks and future potentials of renewables at the sub-regional level, we can develop renewables-related policies which reflect more realistic conditions. According to the simulation results, high FIT prices do not guarantee more introductions of renewables. High FIT prices make the huge potential of renewables commercially viable, but at the same time, they limit the maximum introduction of renewables. In addition, a high FIT budget does not guarantee more renewable introduction.
出处 《Journal of Energy and Power Engineering》 2014年第2期217-225,共9页 能源与动力工程(美国大卫英文)
关键词 Energy technology model renewable energy NUCLEAR Japan. GIS数据 模型分析 日本 可再生能源 设计 灾难 基金 信托
  • 相关文献

参考文献8

  • 1Energy Basic Plan, Japan Government, 2010.
  • 2V. Vlado, Japan's energy security predicament post-Fukushima, Energy Policy 46 (2012) 135-143.
  • 3H. Hiroshi, A. Kanudia, System Analysis of Japanese Renewable Energy, Fujitsu Research Institute Research Report No.404, Apt. 2013.
  • 4P. Fairley, Why Japan's fragmented grid can't cope-bridging Japan's east-west frequency divide to stoke power flows will require real engineering hustle, presented at IEEE Spectrum [online], New York, the US, Apr. 6, 2001, http://spectrum.ieee.org/energy/the-smarter_grid/ whyzjapans-fragmented-grid-cant-cone.
  • 5Survey on Potential of Renewable Energy, Ministry of the Environment, 2011.
  • 6National Institute of Environmental Studies, Path Reviews of Japan Low-Carbon Society-Towards the Realisation of CO2 80% Reduction Society [Online], 2011, http://www.env.go.jp/council/06earth/y060-92/re f0 1-4.pdf.
  • 7WWF Japan, Energy Scenario Proposal Towards Decarbonised Society, Final Report [Online], 2011, http://www.wwf.or.jp/activities/upfiles/20111117Energy Scenario02.pdf.
  • 8R. Loulou, U. Remne, A. Kanudia, A. Lehtil, G. Goldstein, Documentation for the TIMES Model Part 1, Energy Technology Systems Analysis Programme, 2005.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部