摘要
针对邢东矿1200采区煤层埋藏深度变化较大、地层倾角大(最大达36°),陷落柱发育形式特殊、构造复杂等情况,通过在复杂区进行三维地震勘探,运用多种技术手段,克服了地表施工条件及煤层构造极其复杂等困难,取得了良好的地震地质成果,共解释断层50条和异常区5个,为煤矿采区开拓巷道布设提供了可靠的地质依据。
Based on 1200 Xingdong Mine mining area coal seam buried depth varying considerably, large stratigraphic dip (maximum 36° ), the development of collapse column form special, complex structure, and so on and so forth, through 3 d seismic exploration in complex area, by using a variety of technical means, overcame the surface construction condition and the coal structure extremely complex and difficult. The technology obtained the good geological results, a total of 50 fault and abnormal area 5 were explained, which provided a reliable geological basis for exploring the roadway layout for coal mining area.
出处
《煤炭与化工》
CAS
2014年第2期117-119,共3页
Coal and Chemical Industry
关键词
地表复杂
三维地震勘探
资料采集
资料处理
complex surface
3 d seismic exploration
data acquisition
data processing