摘要
以蓬莱19-3项目WHP-E导管架的安装作为例,描述了浅水导管架在拒锤后的安装所需装备、关键技术和主要工艺过程,为后续浅水导管架在出现拒锤后而采取相关的措施提供了借鉴。
Taking Penglai 19-3 WHP-E jacket installation project as' an example, this paper describes the required equipment, key technology and main technological processes in the installation process of the shallow water jacket after Pile refusing. It would be a reference for subsequent shallow water jacket installation.