摘要
地铁列车在载客运行时,一般情况是按照列车的运行计划正点运行,但若列车没有按照计划时间到达,则需要进行运行调整。提出一种创新的,更加有效率的调整方案,在列车重大延迟的时候,能够较好的疏散因延误积累的客流。
In general, subway trains are running punctually in accordance with the train operation plan in passenger - carrying operation. When the trains do not reach the stations at the fight schedule, it is re- quired to conduct operation adjustment, which is to work out a more efficient schedule adjustment to cope with evacuating passenger flow accumulated due to major delays of train.
出处
《铁道通信信号》
2014年第3期36-38,共3页
Railway Signalling & Communication
关键词
地铁
运行调整
自动调整
列车重大延迟
Subway
Operation adjustment
Automatic adjustment
Major delay of trains