期刊文献+

太原地铁2号线工程建设面临的主要岩土工程问题分析 被引量:5

The Main Geotechnical Problems in the No. 2 Line of Taiyuan Metro Construction
下载PDF
导出
摘要 在综合分析太原地铁2号线建设场地地形地貌、地质构造、地层岩性、水文地质条件的基础上,阐述了太原地铁工程建设中所面临的砂土液化、高地下水位、深基坑开挖与支护等诸多岩土工程问题。通过总结类似工程施工技术和经验,提出了能够有效解决太原地铁工程建设所面临岩土工程问题的施工建议和对策。 Based on the comprehensive analysis of the natural topography, geological structure, lithology, and hydrogeology in the site of No. 2 line of Taiyuan Metro, the paper describes the main geotechnical problems which could occur in the con- struction of the metro, such as sand liquefaction, high groundwater level, excavation and supporting of deep foundation pit and so on. Meanwhile, through the summary of the technique and the experience of similar projects, the paper proposes some effective suggestions and countermeasures for solving the geotechnical problems faced by the construction of No. 2 line of Taiyuan metro.
作者 焦清杰
出处 《铁道建筑技术》 2014年第1期35-37,40,共4页 Railway Construction Technology
关键词 地铁 岩土工程 砂土液化 深基坑 metro geotechnical problems sand liquefaction deep foundation pit
  • 相关文献

参考文献3

二级参考文献15

共引文献2

同被引文献35

引证文献5

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部