期刊文献+

转炉炉下道轨地梁优化改造 被引量:1

Converter under an axle beam optimization reconstruction
下载PDF
导出
摘要 介绍了莱钢股份炼钢厂转炉炉下道轨基础损坏的主要原因,提出了解决转炉炉下道轨地梁基础疏松、基础预埋件与混凝土脱离及道轨变形的方案,同时改进了施工方案,将原有的现浇地梁改进为离线预制在线安装,保证了质量,节约了检修时间,在同行业中具有推广意义。 This paper introduces the lai steel stock steel converter under an axle base, the main reasons for the damage to the converter were proposed under rails based degeneration ground beam, the deformation of foundation embedded parts away from the concrete and an axle retrofit scheme, and improved the construction schemes at the same time, the original now irrigate fields of beam to improve for online offline precast installation, ensure the quality, save the maintenance time, promotion of significance in the industry.
作者 王晔霞
出处 《山西建筑》 2014年第9期91-92,共2页 Shanxi Architecture
关键词 道轨地梁 耐热混凝土 预埋件 转炉 钢包车 an axle ground beam, heat-resistant concrete, embedded parts, the converter, ladle car
  • 相关文献

参考文献4

  • 1GB50367-2006,混凝土结构加固设计规范[S].
  • 2S.铁摩辛柯,J.盖尔.材料力学[M].北京:科学出版社.1978.
  • 3GB50010-2002.混凝土结构设计规范[S].[S].,..
  • 4GB50152-92.混凝土结构试验方法标准[S].[S].,..

共引文献3251

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部